7965 |
— |
Borehole |
Somaliland MoWRD |
5/1/2022 |
Woqooyi Galbeed |
gebiley |
Carro yaambo |
2.0 |
Abokor |
1/12/2021 |
Abokor |
— |
9.637716 |
43.81712 |
1376.0 |
— |
1 |
— |
rural |
yes |
— |
Yes |
— |
200 |
— |
— |
— |
10.0 |
— |
147.0 |
gi |
8.0 |
70.0 |
12.0 |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Plastic tank |
16.0 |
PVC |
50.0 |
30 |
0 |
0 |
no |
— |
— |
Submersible Pump |
Granfoc |
15.0 |
132.0 |
Generator |
Perkins |
45.0 |
— |
— |
fair |
There no system connected to the point |
no |
— |
29.0 |
7.63 |
2029.0 |
1100.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
— |
— |
— |
8045 |
— |
Dug Well |
Somaliland MoWRD |
4/9/2022 |
Togdheer |
owdweyne |
Ceel same |
0.3 |
Privately established |
9/4/1975 |
Ceelsame Dug well |
— |
9.383284 |
45.16143 |
1019.0 |
— |
19 |
— |
urban rural |
yes |
— |
Yes |
— |
500 |
1000 |
30 |
1500 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
20.0 |
18.0 |
1.0 |
8.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Other |
0.0 |
Other |
0.0 |
10 |
0 |
0 |
yes |
7 |
9.0 |
No Pump |
— |
— |
— |
— |
— |
— |
— |
— |
poor |
Poor |
yes |
Brown with suspensions |
27.2 |
7.44 |
1424.0 |
905.0 |
— |
Private/Individual |
— |
— |
— |
— |
no |
— |
no |
— |
— |
— |
— |
— |
— |
No intervention is carried out |
No intervention is required |
— |
7297 |
— |
Borehole |
Somaliland MoWRD |
4/9/2022 |
Togdheer |
burco |
Kabadheere B |
0.1 |
Sh.Zumar (Saudi Arabia) |
5/7/2017 |
Kabadheere borehole B |
— |
9.47285 |
45.4413 |
— |
— |
0 |
— |
rural urban |
yes |
— |
Yes |
— |
1800 |
8000 |
0 |
25000 |
0.0 |
— |
180.0 |
gi |
8.0 |
100.0 |
25.0 |
18.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
Galvanised Steel |
200.0 |
250 |
1 |
3 |
yes |
8 |
9.0 |
Submersible Pump |
Grundfos |
11.0 |
166.0 |
Generator |
Perkins |
40.0 |
— |
— |
good |
Supply system was good and fair |
no |
— |
26.8 |
7.17 |
1605.0 |
1050.0 |
— |
Communal |
no |
— |
— |
— |
yes |
0.06 |
yes |
— |
— |
— |
Oxfam Novib |
— |
5/7/2021 |
New tank constraction and pump replacement. |
Fence, latrines. |
— |
7238 |
— |
Borehole |
Somaliland MoWRD |
4/9/2022 |
Togdheer |
owdweyne |
Ceel same |
0.3 |
IR |
8/6/2016 |
Ceel same borehole |
— |
9.378774 |
45.164165 |
1030.0 |
— |
0 |
— |
urban rural |
yes |
— |
Yes |
— |
1400 |
4000 |
20 |
10000 |
0.0 |
— |
280.0 |
gi |
8.0 |
230.0 |
6.0 |
8.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
58.0 |
Galvanised Steel |
300.0 |
200 |
3 |
4 |
no |
— |
— |
Submersible Pump |
Grundfoz |
11.0 |
230.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
— |
19.0 |
good |
Very good |
no |
— |
28.7 |
7.22 |
3270.0 |
1870.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
yes |
— |
— |
— |
CARE Somalia |
— |
13/11/2021 |
Pump and rise pipe replacement |
— |
— |
7917 |
— |
Borehole |
Somaliland MoWRD |
4/9/2022 |
Sool |
las_caanood |
Qoriley |
1.5 |
Turkish Government |
1/1/2021 |
Qoriley borehole |
— |
8.01655 |
47.566982 |
627.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
70000 |
3500 |
200 |
11000 |
0.0 |
— |
440.0 |
pvc |
8.0 |
390.0 |
10.0 |
24.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
26.0 |
Galvanised Steel |
100.0 |
300 |
1 |
3 |
yes |
15 |
3.0 |
Submersible Pump |
Luwara |
15.0 |
290.0 |
Hybrid - Solar/Generator |
GENSET 60 and Perkins 60 |
60.0 |
Unknown |
300.0 |
good |
The system is good no issue appears on the system |
no |
— |
27.0 |
7.7 |
2400.0 |
900.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
Community |
— |
2/2/2022 |
Changed the pump and brought generator 60kwv |
Wall to protect solar system from wind and toilet and watchman room fir the operator |
— |
7708 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
4/9/2022 |
Sanaag |
laasqoray |
Midigale |
0.5 |
ADESO |
1/1/2003 |
Midigale dugwell 1 |
— |
10.683993 |
48.676315 |
809.0 |
— |
3 |
— |
urban |
yes |
— |
Yes |
— |
900 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
12.0 |
5.0 |
3.5 |
2.0 |
7.0 |
24.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
25.0 |
PVC |
1500.0 |
60 |
1 |
— |
no |
— |
— |
Submersible Pump |
Luwara |
— |
12.0 |
Solar |
— |
— |
— |
3.0 |
poor |
1:Submersible pump is not functioning properly.
2:And the well needs to be expanded deeply. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
— |
— |
— |
— |
yes |
0.01 |
no |
— |
— |
— |
CARE-Somaliland |
— |
1/1/2017 |
Elevated water tank
Solar
Submersible pump |
1:Immediate change of the submersible pump
2:PVC pipes
3:Digging the well deeply
4:Generator if possible or solar power storage of battery.
|
— |
7973 |
— |
Dug Well |
Puntland Ministry of Energy Minerals and Water |
4/9/2022 |
Sanaag |
laasqoray |
Midigale |
5.0 |
Community_ |
8/9/2010 |
Midigale dug well2 |
— |
10.689274 |
48.673664 |
799.0 |
— |
2 |
— |
rural urban |
yes |
— |
Yes |
— |
2520 |
500 |
— |
3000 |
1.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
10.0 |
7.0 |
— |
11.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
28.0 |
Galvanised Steel |
700.0 |
— |
4 |
2 |
no |
— |
— |
Submersible Pump |
— |
— |
— |
Hybrid - Solar/Generator |
— |
— |
— |
— |
poor |
Yield is low.
Distributions pipes are rusted.
No sufficient water kiosks in the village.
Distribution pipe lines are disconnected due to the floods. |
no |
— |
32.1 |
7.5 |
1987.0 |
995.0 |
— |
Communal |
yes |
11/5/2000 |
7 |
3 |
no |
— |
no |
— |
— |
— |
Puntland MoEMW |
— |
12/5/2017 |
Placement of distribution pipe lines.
Construction of elevated water tank. |
1: Construction of generator room
2: Digging the deep of the well in order to increase the yield of well.
3: Generator
4: Placement of distribution pipe lines.
5: Rehabilitation of animal water troughs.
5: Rehabilitation of water kiosks.
6: Amergency construction of borehole |
— |
7216 |
— |
Borehole |
Puntland Ministry of Energy Minerals and Water |
4/9/2022 |
Sanaag |
laasqoray |
Cawsane |
8.0 |
IR |
1/1/2017 |
Cawsane borehole |
— |
10.634255 |
48.78973 |
772.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
3000 |
2000 |
— |
7000 |
— |
— |
205.0 |
pvc |
8.0 |
145.0 |
10.0 |
17.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
50.0 |
Stainless Steel |
8000.0 |
7 |
3 |
3 |
yes |
12 |
9.0 |
Submersible Pump |
Luwara |
— |
153.0 |
Hybrid - Solar/Generator |
Perkins |
40.0 |
BR-M250W |
17.0 |
fair |
— |
no |
— |
32.1 |
7.6 |
2150.0 |
1077.0 |
— |
Communal |
yes |
1/1/2018 |
3 |
2 |
no |
— |
yes |
— |
— |
— |
NRC |
— |
1/2/2022 |
Replacement of main raising pipes and the cable |
1: Pipelines are leaking.
2: Generator room''s Roof Rehabilitation.
3: Construction of store room.
4: They need some kind of intervention about the Increased fuel prices.
5: Amergency construction of another borehole due to water demand.
6: Solar power storage( battery)
|
— |
7881 |
— |
Borehole |
Somaliland MoWRD |
4/9/2022 |
Sool |
las_caanood |
Karin gorfood |
0.8 |
IR |
1/1/2014 |
Karin Garfood borehole |
— |
8.127141 |
47.751133 |
702.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
560 |
160 |
0 |
8000 |
0.0 |
— |
290.0 |
pvc |
8.0 |
246.0 |
40.0 |
12.0 |
4.0 |
2.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
48.0 |
Galvanised Steel |
8000.0 |
250 |
0 |
2 |
yes |
12 |
18.0 |
Submersible Pump |
Luwara |
7.0 |
240.0 |
Hybrid - Solar/Generator |
Perkins |
60.0 |
Photovoltiac module |
300.0 |
good |
The supply is working good though the solar system is not functioning due to electrical shock that damage the entire soil panels. |
no |
— |
27.0 |
7.9 |
2700.0 |
1900.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
IR |
— |
9/4/2020 |
Installed new pump and and make maintenance to the pipelines |
Solar panels are not working and require either replacement or repairing |
— |
8083 |
— |
Borehole |
Somaliland MoWRD |
4/9/2022 |
Sool |
las_caanood |
Saahdheer |
0.6 |
NPA |
9/4/2014 |
Saaxdheer borehole |
— |
8.006854 |
47.103992 |
605.0 |
— |
1 |
— |
rural urban |
yes |
— |
Yes |
— |
5000 |
2100 |
0 |
1200 |
0.0 |
— |
370.0 |
pvc |
8.0 |
324.0 |
12.0 |
6.0 |
0.0 |
0.0 |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
— |
Concrete/Masonry tank |
72.0 |
Galvanised Steel |
650.0 |
20 |
5 |
7 |
yes |
30 |
8.0 |
Submersible Pump |
Luwara |
45.0 |
320.0 |
Hybrid - Solar/Generator |
Perkins |
45.0 |
BR-M300W |
300.0 |
good |
All the system are working properly |
no |
— |
31.0 |
7.4 |
1260.0 |
960.0 |
— |
Communal |
no |
— |
— |
— |
no |
— |
no |
— |
— |
— |
CARE Somalia |
— |
9/5/2020 |
Construction of generator room. Pipeline extension 2 meters kiosks Construction . Supply of riding pipes and fencing 110 m wires |
Rehabilitation of water tank that has leakage and fencing the location of the borehole to protect from an authorised personnel. |
— |